Process capability


Process capability


Process capability is a tool

to measure ability of process to meet specification

A process is said to be highly capable when all the outputs from the process lie closer to the central value

We can also say that Process capability is a measure of dispersion of process output (like range, standard deviation ), 
means it measure how much output from process are closer/spread/disperse around its central value.

Process is said to be statistically controlled then all outputs of the process will lie between -3σ to +3σ . which means
 process capability of process would became 6σ

                        ∴ process capability =  6σ                where, σ = standard deviation




 Process capability index -  Cp

         

                    
 Where    Cp  - Capability index

              Ïƒ  - Standard deviation

Cp = 1 then process output lie within specification limit

Cp > 1 then process meet specification

Cp < 1 then Process  is not capable to meet specification

Process capability can be describe in terms with voice of customer , voice of process










Limitation

Limitation of process capability index is it does not measure process performance
 in terms of process is centered or not
 (ie Cp  not changed if process average is shifted)
To overcome that
When the process is not centered,  Cpk is given by following formula




  • For process average shifted to lower side



  • For process average shifted to upper side



 If Cpk = 1 then process is said to be marginally capable
Cpk > 1 then process is said to be capable
Cpk < 1 then process is said to be incapable


  • Companies see that they achieve at least a Cp=Cpk value of 1.33 to be on the safer side
  • Cp will be equal to Cpk when the process is centered
  • Value of Cp does not change as a change occurs process in center


    EXAMPLE

    One can understand and calculate process capability easily by below example and format

    Process capability Example and format link 



    WALL THICKNESS ANALYSIS REPORT (Std.Dev., CP, CPK Study)
    Date
    Product Name Agri Pipe
    Size
    90 MM 4 Kg selfit
    Sample Qty.48 Nos
    OD Min Req.mm
    OD Max Req.mm
    Thick Min Req.2.10mm
    Thick max Req.2.60mm
    Batch No
    M/c No.

    Time

    Sample No.
    Wall Thickness at 4 pts.Pt.1(marking side)
    Pt.1Pt.2Pt.3Pt.4

    7:30:00 AM
    12.302.252.382.26
    22.252.202.372.27

    8:30:00 AM
    32.312.292.352.29Pt.4Pt,2
    42.272.202.302.27

    9:30:00 AM
    52.292.252.312.25
    62.272.202.312.21

    10:30:00 AM
    72.252.202.372.36Pt.3
    82.272.212.312.25(Position of WT measurement)

    11:30:00 AM
    92.242.222.352.26
    102.202.172.312.28

    12:30:00 PM
    112.222.192.332.26
    122.222.322.302.25

    1:30:00 PM
    132.182.302.342.28
    142.202.202.372.27

    2:30:00 PM
    152.222.252.352.25
    162.272.232.302.22

    3:30:00 PM
    172.192.152.382.31
    182.202.172.342.30

    4:30:00 PM
    192.212.232.302.32
    202.222.162.372.31

    5:30:00 PM
    212.232.162.382.34
    222.202.172.392.32

    6:30:00 PM
    232.232.142.342.30
    242.212.162.352.32

    7:30:00 PM
    252.222.162.362.31
    262.232.192.352.28

    8:30:00 PM
    272.202.192.322.32
    282.222.152.332.27

    9:30:00 PM
    292.242.162.362.31
    302.202.162.312.34

    10:30:00 PM
    312.182.192.342.30
    322.212.172.332.29

    11:30:00 PM
    332.152.222.292.33
    342.102.162.282.31

    12:30:00 AM
    352.162.212.322.28
    362.182.252.262.31

    1:30:00 AM
    372.152.192.292.30
    382.172.192.302.34

    2:30:00 AM
    392.172.162.342.30
    402.132.142.312.29

    3:30:00 AM
    412.202.182.262.31
    422.122.202.302.34

    4:30:00 AM
    432.182.212.372.32
    442.152.222.352.31

    5:30:00 AM
    452.212.262.282.34
    462.192.212.322.32

    6:30:00 AM
    472.142.242.272.29
    482.202.232.282.30
    Min range2.10
    Note : We took 48 pipes (6 Mtr.each) at an equal intervals in a span of 24 hrs. production run . Wall thickness measured on pipe spigot end.
    Max range2.60
    Min2.10
    Max2.39
    Avg2.26
    Range 0.29Guidelines :
    Mod2.31
    CP <1 , Poor Process, not within control
    How to find standard deviation in MS Excel and google sheetStd dev0.07
    CP = 1 , Process is Ok, require further tuning


    How to calculate Standard deviation in MS Excel & google sheet 
    Total Tole0.50
    CP > 1 , Process is good & well within control
    CP1.26
    CP>1.50, Process is excellent & well within
    CPK10.81
    control
    CPK21.71
    Value of CPK1 & CPK2 tells about location of
    process Curve (Centrally located ,
    shifted to lower side or shifted to upper side)
    Remarks :How to calculate standard deviation in google sheet and MS Excel and manualy
    Prepare By : ---------------------

    Analysis Result

    Process is good & well within control
     






     Note : For achieving Cp =1, we have to maintain (Improve Process) standard deviation is 
    equal to 1/3 rd of specification limit  

    and for achieving Cp>1, we have to improve process, so that standard deviation would improve
    less than 1/3 rd of specification limit